Watertec 9000

Capable of performing a range of water well drilling methods including mud rotary, DTH hammer and flooded reverse circulation, the compact, robust Dando Watertec 9000 boasts a pullback of 10,000kgf and is available with various mounting options including crawler, truck, trailer and skid.

The standard mast allows the loading of 3m rods while an optional hydraulically deployed mast extension facilitates the pulling of 6m lengths of rods to enable faster rod removal.

Features
  • Truck mounted as standard, but also available on tracks, skid or customer’s own support vehicle.
  • High-torque, high-speed rotary head
  • Mast dump
  • Hydraulic winch
  • Hydraulic rod clamps/breaker available as an option
  • Safe hands-free pipe handler eliminates the need of physical lifting and manipulation of drill rods
  • Selection of mud pumps available
  • Foam injection pump
  • Inline oil lubricator
Specification
Case Studies
Options
Drilling Depths

"Despite its incredible power and versatility, the small size of the Multitec 9000 ensures running and maintenance costs are kept low."

Watertec 9000: A favourite for NGOs, government and military departments and private contractors requiring a powerful, solid rig on a compact 4x4 truck or trailer for medium depth wells.

Latest News

NEW Multitec 4000 MK3 Now Available

The Multitec 4000 MK3 is the latest development in Dando’s range of powerful yet compact multipurpose drilling rigs. Occupying a small footprint, the multipurpose rig is able to carry out a wide range of drilling techniques in areas of difficult access. The Mk3 has more power, a highly efficient Bosch-Rexroth hydraulic system and revised layout of … Read more

About this event

Anderson Water: Case Study

Commenting on his choice of a Dando Multitec 9000 drilling rig, Cam Wiebe of Anderson Water Services says, “While the bread and butter of our business is drilling water bores, these days it is important for drill contractors to have versatile equipment that can be used for work in other sectors. The Multitec 9000 provides … Read more

About this event

Multitec 9000 and Construction of the Nigale Bridge, Venezuela

Puente Nigale, the second bridge crossing over lake Maracaibo in Venezuela will connect Santa Cruz de Mara with Punta de Palmas. Designed by consultant Cowi, the bridge is being constructed by Brazilian contractor Odebrecht. Lankelma is working for Venezuelan engineering consultant and contractor Geohidra to investigate locations for the foundations of the 10.8km road and … Read more

About this event

Bringing Water to Burkina Faso

Landlocked Burkina Faso in West Africa is one of the poorest countries in the world ranking 183rd out of 187 countries in the United Nations Human Development Index. With a population of 17 million people, almost a quarter lack access to safe water and 12,000 children under the age of five die every year from … Read more

About this event

Dando’s Water Well Drilling Programme in Borno State, Nigeria

Groundwater is an extraordinarily valuable resource for many reasons. The quality is normally excellent because the soil and rocks through which it flows help to remove pollutants and it therefore requires far less treatment than river water to make it safe to drink and, because groundwater responds slowly to changes in rainfall, it stays available … Read more

About this event

Contact a member of the Dando Asia Sales Team